Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

South Africa welcomes Nersa’s withdrawal of SSEG registration rules

5/22/2018

0 Comments

 
Picture
Nonprofit organisation, the Organisation Undoing Tax Abuse (Outa), has welcomed the National Energy Regulator of South Africa’s (Nersa’s) decision to withdraw the proposed rules to govern the registration of small-scale embedded generation (SSEG) below 1 MW.

The proposed SSEG rules were published for public comment by Nersa on its website last month.

On Monday, Nersa executive manager for electricity regulation Mbulelo Ncetezo said the draft rules had been withdrawn until the Department of Energy (DoE) gazettes a revised notice.

Outa believes there is a lack of clarity by those in authority as to the need and purpose for the registration of SSEG.

The organisation is also concerned about Nersa’s readiness to administer the registration process, says Outa energy portfolio manager Ronald Chauke.

Earlier this month, Outa formally objected to Nersa’s proposed rules and called on the DoE to level the playing field and create an enabling environment.

Outa says the DoE should clarify to what extent the public and commercially interested entities would be empowered to introduce self-sufficiency initiatives to meet their daily electricity requirements.

“Tapping into free natural resources, such as solar and wind power, should not be controlled or subjected to an onerous registration process, especially if these systems are ringfenced and not linked to the grid,” notes Outa.

The organisation believes the new direction of energy self-sufficiency poses a significant threat to State-owned power utility Eskom’s future, with an envisaged dip in sales volumes, and that government’s unnecessary interference is likely to attract a legal challenge to the constitutionality of such actions.

Outa calls on the DoE to draft its amended regulations in such a manner that reduces government inference and encourages the promotion of the rights and processes of energy self-sufficiency in SSEG.

Additionally, Outa believes the DoE should not meddle with the safety and specifications of the requirements or standards of SSEG, as this is best overseen by the South African Bureau of Standards and other regulatory bodies – which take their guide from other countries where the specifications for solar panels, generators, wind turbines and other systems have already been set. 

Source...... 

0 Comments



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Farm
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.