Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

SOLAR PV GUIDELINES AND INSTALLATION STANDARDS

9/22/2021

0 Comments

 
Picture
In 2017, the South African Department of Energy (DoE) released Schedule 2 to the Electricity Act of 2006, which revised the licensing and registration requirements for categories of generators. Under these new rules, generators smaller than 1MW are exempted from having to obtain a license but need to be registered with NERSA. Every form of home electricity generation – including solar photovoltaic (PV) panels and backup generators – will have to be registered with the government under draft rules published by the National Energy Regulator of SA (NERSA) for public comment. The proposed SSEG rules were published for public comment by NERSA on its website on 26 April 2018.

These rules have yet to be implemented. The Organisation Undoing Tax Abuse (OUTA) called on NERSA to scrap these rules, and in May 2018 that is exactly what they did. Nevertheless, the City of Cape Town has implemented these rules in their municipality as of May 2019, and the City of Tshwane has followed suit in 2021. This was done as a pre-emptive move towards legislation that is on hold now.

OUTA gave on their newsroom platform the following statement.“The Department of Energy (DoE) should not interfere with the safety and specifications of the requirements or standards of embedded energy generation, as this is best overseen by the South African Bureau of Standards (SABS) and other regulatory bodies who often take their guide from other countries where the specifications for solar panels, generators, wind turbines and other systems have already been set.” Ronal Chauke, OUTA’s Energy Portfolio Manager said “The administration required by these draft rules is cumbersome and unnecessary. Government should work with its citizens to promote access to reliable energy rather than overburdening them with costs and administrative requirements.”

IN SOUTH AFRICA, THERE ARE NO OFFICIAL REGULATORY RULES ENFORCED BY THE GOVERNMENT THAT NEED TO BE ADHERED TO WHEN IT COMES TO PV SYSTEM INSTALLATIONS.

Homeowners installing solar energy systems must comply with the registration requirements applicable in certain areas, but official conformity codes regarding certain aspects of an installation do not currently exist. This could be a big problem. With specific South African PV industry regulation not yet in place, it is an unfortunate fact that many smaller “installers” are not adequately qualified and do not prescribe to any standards. This can lead to dangerous situations that can even lead to electrical fires. While there are compulsory wiring standards for general electrical installations, there is no dedicated national standard for PV installations yet. Ask your installer about the installation standards they follow.

The standards and quality management are driven by the industry and even quality assurance is achieved in this manner. You can also play an important part in ensuring that your PV system is true to the industry standards and requirements. Collecting as much information as you can about this aspect could save you a lot of heartaches when it comes to the safety and performance of your system. Let’s look at some rules and regulations that are being practiced by reputable installers.

At the core of every PV system is an electrical system that carries electricity generated by your PV panels to your wall outlets to be utilised in every electrical need that you might have. As such, installers should always. And when you are connected to the grid, you have the extra responsibility to ensure the grid is protected and not compromised by your PV system. Every electrical system has the risk of electrical shock, arcing, and fire when not correctly installed; your PV system is no different and installers should always follow the Electrical Installation Regulations of the OHS Act. The following errors should be avoided:
Read more ......
​

Advert

Picture
0 Comments



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Farm
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.