
Of the 3 725 MW to be generated through the DoE’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), 100 MW was allocated to the procurement of smallprojects, which individually had to have a generation capacity of between 1 MW and 5 MW.
Read more.....