Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

NUMSA goes to court over City Power solar water heater tender

5/20/2013

1 Comment

 
Picture
On Tuesday 28 May, the National Union of Metalworkers of South Africa (NUMSA) will take City Power to court over Johannesburg municipal electricity utility's refusal to disclose information on the basis of which a R800-million tender for supply and installation of low pressure solar water geysers was awarded in May 2012. The matter will be heard at South Gauteng High Court in Johannesburg. The union has also lodged an application with the Johannesburg Metropolitan Police Division (JMPD) for NUMSA shopstewards from all solar geyser manufacturing plants to picket outside the court on that day.

Why are we going to court?

Exactly a year ago, NUMSA wrote to City Power with a request for information that explains the criteria used to adjudicate the utility's tender for supply and installation of low pressure solar water geysers (BID 1883GS). On 21 May 2012, our General Secretary Irvin Jim wrote to City Power's Tender Advice Centre requesting a meeting where the electricity company could explain the decision that it had reached on awarding the tender.

Without exaggeration, we can openly say that in the 12-months since we wrote to City Power we have been met with skilful "duck and diving" and perfected delaying tactics. City Power even went to the extent of giving us a "dummy" of blank forms and documents, hoping that NUMSA would eventually abandon its demand for explanation of the Adjudication Committee's decision.

Hereunder is a chronology of our attempts to secure a meeting with City Power and an explanation on the decision of the Tender Committee:

21 May 2012: NUMSA General Secretary writes to City Power requesting a meeting with the municipal-owned electricity enterprise

23 May 2012: City Power writes back to NUMSA acknowledging the union's letter, with a promise to furnish the union with feedback soon

14 Aug 2012: After receiving no response, NUMSA writes another letter to City Power

13 Sept 2012: Lawyers instructed by NUMSA write to City Power requesting the information

19 Sept 2012: NUMSA lawyers write again to City Power after the company failed to acknowledge the lawyers' letter

Sept 2012: City Power writes back to NUMSA lawyers advising them that investigation relating to the bid was finalised and that the report will be tabled in the Adjudication Committee meeting of 15 October. In the same letter, City Power indicated availability to meet NUMSA and its lawyers "on any date after the 15th of October 2012"

15 Nov 2012: After postponement of numerous meetings and after obtaining City Power forms for a Request for Access to Record of Public Body, NUMSA filed an application with the company using Section 18(1) of the Promotion of Access to Information Act (Act. No.2 of 2000)

03 Dec 2012: City Power asked our lawyers to come and pick up the documents we have been requesting. When our lawyers picked up the documents they found out that they were blank

04 Dec 2012: Our lawyers wrote to City Power insisting that NUMSA requires the documents

08 Jan 2013: NUMSA lawyers wrote to City Power indicating the intention of the union to approach the High Court.

After so much unabashed stonewalling, the union had no option but to approach the High Court. Workers and the oppressed people of South Africa fought hard against the secretive and unresponsive culture of public and private bodies under apartheid. The right of access to information in section 32(1) (h) of the Constitution is a direct result our struggles. NUMSA will not sit idly while our rights are being trampled by corporatised public utilities such City Power. As a union, we will not fold our arms when municipal entities refuse to act in a transparent manner. City Power, if it is a genuinely publicly-owned entity should be in the forefront of promoting transparency and the right of access to information. The electricity utility should have nothing to hide from the public who supposedly owns City Power and who the company is meant to serve.

What is the significance of the matter?

In addition to our principled defence of our constitutional right of access to information, NUMSA is taking up the case for two other reasons. Firstly, NUMSA is the union that organises workers in plants that manufacture solar water heaters. Secondly, the union has been involved since the beginning of 2012 in efforts to have solar water heaters designated under the revised Preferential Procurement Policy Framework Act (PPPFA) regulations.

The inclusion of solar geyser components in the January 2013 Department of Trade & Industry (DTI) list of designated products is a direct result of our efforts. What this means is that solar water heaters that are put on rooftops using the public purse must be manufactured locally and that the components that go into the solar heating systems must be "Proudly South African".

It is our suspicion that the swiftness with which the request for tenders was issued by City Power and the tender awarded was a calculated way to circumvent the local content requirements that were being negotiated. Since President Jacob Zuma launched the programme for public sector installation of 1-million solar water heaters by 2014, NUMSA has been critical of large scale importation of geysers used in the rollout. Our request for an explanation of the basis on which City Power awarded the tender is to precisely look at how much weighting in the whole process was given to local manufacturing. Government together with labour and business are signatories to the October 2011 Local Procurement Accord. City Power as a local state entity is bound by the accord.

Conclusion:

NUMSA will leave no stone unturned in its efforts to obtain the information that it requires. While casting no aspersion at this stage, we are fully aware of reported shenanigans around City Power tenders including the R1.25 billion smart meter contract to the Vivian Reddy's Edison Power Group that is currently being investigated by the Public Protector.

Our effort for now is to get the information on whose basis BID 1883GS for solar water heaters was awarded. Our interest is to ensure that the bulk of goods and services that are used in the government infrastructure programme are procured and manufactured locally. For this we are prepared to go to the highest court in the land. For this, we will mobilise our members to act in defence of their interests.

On the City Power case we are talking and asking for support from our sister union that organises workers at the electricity utility, the South African Municipal Workers Union (SAMWU). We are positive that together we will break the hold of those who believe that decisions that affect communities can be made in smoke-filled rooms with no accountability to those that they are meant to serve.

Statement issued by Castro Ngobese, NUMSA national spokesperson, May 19 2013


Source......

1 Comment
Vusumzi leonard Mdwaba
3/10/2014 06:40:10 am

This issue is serious because this year one of the company that is manufacturing solar geyser local retrench 60 workers that were employed due to the announcement of SWH in 2012 by the Mr Jacob Zuma in the state of nation address. He said this programme will create and increase jobs in south africa but now we are seeing more SWH have been imported from China. The product of south africa is low and we are the one that are paying Tax in this country but those who represent us decided to import the SWH and we are left without job. The procurement stated that they need a local content but those rules were never implemented that is why as Numsa members we want the information or criteria that was used by City Power we want justice in this issue only justice.

Reply



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Farm
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.