Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

Explosion of private solar and wind power for South Africa

10/27/2021

0 Comments

 
Picture
Eskom announced on Tuesday that it had shared its Transmission Development Plan (TDP) for the period 2022 to 2031 with stakeholders during a virtual public forum.

This forms part of the power utility’s transmission licence requirements issued by the National Energy Regulator of South Africa.

It calls on Eskom to publish a TDP annually.

Eskom said that 30GW of new generation capacity is expected to come online during this planning period — mainly from renewable energy sources such as solar photovoltaics and wind.

This represents more than two-thirds of Eskom’s coal-based generating capacity of 44,055 megawatts (44.1GW). Eskom’s total installed capacity is 51,920.2MW.

The power utility noted that this 30GW of new solar and wind generation capacity would be built in areas with limited electric network infrastructure.

Former South Africa Wind Energy Association CEO Ntombifuthi Ntuli previously told MyBroadband that wind power would make up a total of 14.4GW of power supply by 2030.

“Wind energy will play a significant role in the energy transition as it will contribute 18% to the total power system by 2030,” she stated.

Eskom said that it would need to build an additional 8,300km of extra-high-voltage lines and 119 transformers to bring on board 58,970 MVA of transformer capacity over the next ten years.

“The total Eskom Transmission capital plan amounts to R178 billion over the next ten years,” said Eskom group executive for transmission, Segomoco Scheppers.

“Of this amount, R144 billion is required for new capacity expansion projects to meet the reliability requirements, connection of new generation capacity and loads, as well acquire servitudes.”

Advert

Picture
​Scheppers said a further R34 billion is required for refurbishments to the existing asset base and procurement of production equipment, as well as strategic spares.

“As a state-owned entity, Eskom understands the critical role it plays in enabling South Africa’s economic recovery efforts,” stated Scheppers.

“Without reliable electricity, there can be no sustainable economic recovery or growth.”


Segomoco Scheppers, Eskom group executive for transmission
Scheppers also said that work is underway to connect utility-scale renewable generation projects for Bid Window 5 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP).

These projects are expected to be connected to the national electricity grid by 2024/25.

“We are also making our systems ready to connect the additional 2,000 MW capacity procured through the Risk Mitigation Independent Power Producer Procurement Programme (RMIPPPP),” said Scheppers.

This capacity is meant to relieve pressure on Eskom’s grid and reduce the need for load-shedding.

However, the RMIPPP involves controversial Turkish powership supplier Karpowership.
0 Comments



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Farm
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.