Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

Emperors Palace continues to take the lead with innovative energy saving solution

9/7/2017

0 Comments

 
Picture
The construction of one of the largest rooftop solar PV (photovoltaic) plants in South Africa has commenced at Emperors Palace and the second phase of the project has just been completed.  “After a total of 9 months of installations, the 2.723MWp solar PV plant is now fully functional, thereby attaining a milestone for Peermont and Emperors Palace”, comments Dave Milne, Peermont Hotel and Resort Executive.
The building of the solar PV plant at Emperors Palace was completed by Terra Firma Solutions, a leading energy engineering solution provider who first conducted a detailed study to ensure that the roof could support the weight of the solar panels and associated equipment.  As a result, the plant was split up into smaller plants (arrays), across different roof sections.  The study also entailed an analysis of the electrical demand of the site and due to its scale, it was concluded that all the solar power produced, will be utilised by Emperors Palace directly.
Says Ed Gluckman, Managing Director of Terra Firma Solutions, “The solar PV plant at Emperors Palace is one of the largest; if not the largest rooftop solar PV plants built to date on a hospitality and gaming site in South Africa and quite possibly the entire Southern Hemisphere.  At peak production, the solar PV plant is expected to produce 38 to 45% of Emperors Palace’s electricity power requirement.”
All in all, 8 949 modules (solar panels) have been installed which covers approximately 17 000 square meters of roof which includes a 1.1 MW shaded parking structure.  A total of 68 inverters have been installed along with 42km’s meters of cabling to connect the various arrays at 11 different tie-in points to the various buildings.  To put this into context, the annual power production of the solar plant could power 1 000 standard, 3 bedroomed family homes for a year.
“We are extremely excited about the practical implications of the new solar PV plant.  By reducing the energy consumption for Emperors Palace, we are contributing to significant carbon footprint savings per annum, proving that Peermont is a leader in innovation.  But this initiative is just one of our key priorities and we have a dedicated sustainability programmes to reduce the group’s energy and water consumption, decrease waste and promote recycling,” Milne concludes.

Source......

Picture
0 Comments



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Farm
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.