Southern African Renewable and Alternative Energy Association (SAAEA)
  • Home
  • ABOUT US
    • Services
    • Advertise with us....
    • Our Partners
    • Privacy Policy
  • MEMBERS
    • Members
    • Membership Benefits
  • News
  • Tenders
  • Technologies
    • Wind
    • Solar PV
    • Solar CSP
    • Solar Water Heating
    • Hydro
    • Biogas
    • Biomass
    • Waste to Energy
    • Fuel Cells
    • Batteries
  • FUNDING
  • Events Calendar
  • Contact Us

Big revelations by Eskom CEO Andre de Ruyter about what really caused load-shedding

11/2/2021

0 Comments

 
Picture
Eskom is facing severe challenges, including senior managers not doing their jobs and employees ignoring alarms at power stations.

These problems were revealed by Eskom CEO Andre de Ruyter and COO Jan Oberholzer in separate media briefings.

For over a year, Eskom promised South Africans that load-shedding would be significantly reduced from September 2021 because of their extensive maintenance plans.

Eskom asked the public to grin and bear load-shedding until this time as it was needed to create a reliable generation system.

The time of reckoning has now arrived, and Eskom failed miserably.

South Africa experienced the worst load-shedding it had ever seen over an October period. It was clear that Eskom promise of a more reliable generation system was misguided.

People were looking for answers, and De Ruyter and Oberholzer played open cards in recent media briefings.

Eskom’s Chief Operating Officer Jan Oberholzer confirmed that “pure negligence” by Eskom staff contributed to the recent load-shedding.

Oberholzer said employees did not perform their duties, which included ignoring alarms at power stations.
​
Advert

Picture
​De Ruyter added that an operator at the Kusile power station ignored a flashing light on a control panel that indicated a low oil level. It led to a power generation unit tripping.

De Ruyter also admitted that their plants had been poorly maintained and remained unreliable.

“At this stage, our poorly maintained power plants are calling the shots. That is why we had load-shedding,” De Ruyter told The Money Show’s Bruce Whitfield.

“We could have avoided it, but regrettably, the lack of reliability of our system caught up with us, and we had to implement load-shedding.”

De Ruyter admitted that incompetence and neglect by Eskom staff is one of the major reasons for the recent bout of load-shedding.

“When you look at the bad habits that many of Eskom employees acquired during the era of state capture – especially when some of my less than illustrious predecessors were in charge and pulled levers to enrich themselves — that embedded very poor operational practices,” he said.

“To unlearn those practices are going to require some doing. We have already made a number of management changes.”

The Eskom CEO added that they have a management gap at some of their power stations where the managers should improve their performance.

The problems do not stop there. There is a command structure below stations managers where Eskom has suffered a depletion of skills.

“One person cannot operate a power station, which means you have to rely on the skills you have available. That malaise which crept in over the years will take time to restore,” he said.

De Ruyter said the fact that many Eskom managers — who are exceptionally well paid — do not take pride in their jobs and ensure their power stations run well is causing him to lose sleep.

“This is an issue which leads to Eskom letting down 60 million South Africans. It is something the lackadaisical managers don’t understand.”

He dismissed speculation that the recent load-shedding was an orchestrated event.

“It was caused by a number of failures of key power plants, and as a consequence, we had to go into stage 4 load-shedding,” De Ruyter said.

De Ruyter also dismissed rumours that load-shedding was stopped over the election weekend because the government instructed Eskom to do it.

“This was entirely an Eskom decision. We have taken a look at the units that came back from unplanned outages, and we felt comfortable suspending load-shedding,” he said.

Source.......
0 Comments



Leave a Reply.

    Picture
    Picture

    Tender Alerts
    ​

    Tenders available to Gold Members....

    Categories

    All
    Air Conditioning
    Algae
    Alternative Energy
    Battery
    Battery Backup
    Bioenergy
    Biofuel
    Biogas
    Biomass
    Blockchain
    Business Opurtunities
    Carbon Credits
    Carbon Footprint
    Carbon Tax
    Carbon Trading
    Clean Cook Stoves
    Climate Change
    Cogeneration
    Concentrated Solar Power
    Cpv
    Csp
    Demand Side Management
    Desalination
    Distributed Generation
    Electric Vehicles
    Embedded Generation
    Employment
    Employment Wanted
    Energy Efficiency
    Energy Management
    Energy Storage
    Eskom
    Events
    Events And Conferences
    FreedomCor
    FSAAEA
    Fuel Cells
    Funding
    Funding For Renewables
    Funnies
    Gas
    Gas Generation
    Gas To Liquids
    Gas To Power
    Generators
    Green Building
    Green Cities
    Heat Recovery
    Hydrogen
    Hydro Power
    Independant Power Producer
    Integrated Resource Plan
    Inverters
    Ipp
    Irp
    Kinetic Energy
    Landfill Gas
    Led Lighting
    LiFePO4
    Load Shedding
    Member Profiles
    Members
    Member Updates
    Methane
    Microgrid
    Mini Grids
    Miscanthus
    MSAAEA
    Nersa
    Net Metering
    News Africa
    News Global
    News South Africa
    News UK
    News USA
    Nuclear
    Ocean Power
    Our Partners
    Our Social Responsibility
    Pay As You Go Solar
    Power Purchase Agreement
    Power Ship
    Ppa
    Pv Mounting Systems
    Reipppp
    Renewable Energy
    Renewable Energy Events
    Renewable-energy-tax-incentives
    Renewables
    Renewables South Africa
    Risk Management
    Rooftop Pv
    SAAEA
    Shale Gas
    Small Project Ipp
    Solar Aircon
    Solar Power
    Solar Pv
    Solar Water Heating
    Solar Water Heating Swh6206859afc
    South Africa
    Specials
    Sustainable Development
    SWH
    Technologies
    Tenders
    Tenders For Renewable Energy
    Tesla
    Thin Film Pv
    Training
    Tyre Depolymerisation
    Tyre Recycling
    Ups
    Waste To Energy
    Water
    Wave Power
    Wind Farm
    Wind Measurement
    Wind Power
    Yingli

    RSS Feed

    See older posts...

    View my profile on LinkedIn
Powered by Create your own unique website with customizable templates.